Given, Sp. heat capacity of water, s = 4200 J/KgK
Temperature difference, Δt = 0.21 °C
Let 'h' be the height of the waterfall and 'm' be the mass of water.
Then, P.E of the water = mgh
Given that, heat energy, H = 60% of P.E
or, 4200 x 0.21 = 0.6 x 10 x h
or, h = `(4200 xx 0.21)/(0.6 xx 10) = 882/6` = 147 m
APPEARS IN
संबंधित प्रश्न
When do we say that work is done?
An object thrown at a certain angle to the ground moves in a curved path and falls back to the ground. The initial and the final points of the path of the object lie on the same horizontal line. What is the work done by the force of gravity on the object?
What are the quantities on which the amount of work done depends? How are they related to work?
A water pump raises 50 kg of water through a height of 25 m in 5s. Calculate the power supplied by the pump (Take: g = 10 N kg−1).
Mention whether work is done or not in the following activity.
| S. No | Activity | Work done or not done |
| 1. | Pushing the door | |
| 2. | Holding a doll | |
| 3. | Sitting in a bus | |
| 4. | Pushing a wall | |
| 5. | Digging soil |
A is a push or a pull ______.
Look at the activity below. Reason out whether or not work is done in the light of your understanding of the term ‘work’.
A wind-mill is lifting water from a well.