If 36 men can do a piece of work in 25 days, in how many days will 15 men do it?
Advertisements
उत्तर
Let x be the number of days in which 15 men can do a piece of work.
| Number of men | 36 | 15 |
| Number of days | 25 | x |
\[\text{ Since the number of men hired and the number of days taken to do a piece of work are in inverse variation, we have } : \]
\[36 \times 25 = x \times 15\]
\[ \Rightarrow x = \frac{36 \times 25}{15}\]
\[ = \frac{900}{15}\]
\[ = 60\]
\[\text{ Thus, the required number of days is 60 } .\]
APPEARS IN
संबंधित प्रश्न
In which of the following table x and y vary inversely:
| x | 5 | 20 | 10 | 4 |
| y | 20 | 5 | 10 | 25 |
A work-force of 420 men with a contractor can finish a certain piece of work in 9 months. How many extra men must he employ to complete the job in 7 months?
Three spraying machines working together can finish painting a house in 60 minutes. How long will it take for 5 machines of the same capacity to do the same job?
If x and y vary inversely as other and x = 3 when y = 8, find y when x = 4 .
Mohanrao took 10 days to finish a book, reading 40 pages every day. How many pages must be read in a day to finish it in 8 days?
It takes 120 minutes to weed a garden with 6 gardeners. If the same work is to be done in 30 minutes, how many more gardeners are needed?
A flood relief camp has food stock by which 80 people can be benefited for 60 days. After 10 days 20 more people have joined the camp. Calculate the number of days of food shortage due to the addition of 20 more people?
Six men can complete a work in 12 days. Two days later, 6 more men joined them. How many days will they take to complete the remaining work?
If x varies inversely as y and x = 4 when y = 6, then when x = 3 the value of y is ______.
If a tree 24 m high casts a shadow of 15 m, then the height of a pole that casts a shadow of 6 m under similar conditions is 9.6 m.