Advertisements
Advertisements
प्रश्न
A weight lifted a load of 200 kgf to a height of 2.5 m in 5 s. calculate: (i) the work done, and (ii) the power developed by him. Take g= 10 N kg-1.
Advertisements
उत्तर
Given load m = 200kgf, displacement h = 25 m, time = 5s, g = 10 N kg-1
Now work done = 200 kgf x 25 = 50000 J
or power = `"work done"/"time taken" = 5000/5` = 1000 watt
APPEARS IN
संबंधित प्रश्न
The velocity of a car increases from 54 km/hr to 72 km/hr. How much is the work done if the mass of the car is 1500 kg?
Draw a neat labeled diagram to show the direction of two forces acting on a body to produce rotation in it. Also mark the point about which rotation takes place.
Explain the difference between a uniform linear motion and a uniform circular motion.
Complete the following sentences:
The SI unit of work is ....... and of power is .......
A machine raises a load of 750 N through a height of 16 m in 5s. calculate:
(i) work done by machine,
(ii) power at which the machine works.
A woman pulls a bucket of water of total mass 5 kg from a well which is 10 s. calculate the power used by her.
Fill in the boxe to show the corresponding energy transformation.

What is work?
A uniform chain of length 2 m is kept on a table such that a length of 60 cm hangs freely from the edge of the table. The total mass of the chain is 4 kg. What is the work done in pulling the entire chain on the table?
