Advertisements
Advertisements
प्रश्न
A machine raises a load of 750 N through a height of 16 m in 5 s. calculate:
- energy spent by machine,
- power at which the machine works.
Advertisements
उत्तर
- Energy spent by machine or work done = F × S
Work, W = 750 × 16 = 12000J - Power spent = `"work done"/"time taken " = "12000j"/"5s" = 2400 "w"`
APPEARS IN
संबंधित प्रश्न
A force of 7 N acts on an object. The displacement is, say 8 m, in the direction of the force (see the given figure). Let us take it that the force acts on the object through the displacement. What is the work done in this case?

Define the term energy.
A body, when acted upon by a force of 10 kgf, moves to a distance 0.5 m in the direction of force. Find the work done by the force. Take 1 kgf = 10 N.
When do we say that work is done? Write the formula for the work done by a body in moving up against gravity. Give the meaning of each symbol which occurs in it.
P, Q and R are three forces which act as shown in fig.

The point O lies in the same plane. Given, P = Q = R = 10N
(i) Which force has the least moment about O? Give a reason.
(ii)Which force has the greatest moment about O? Give a reason.
Complete the following sentences:
The SI unit of work is ....... and of power is .......
What do you understand by the term energy? Is energy a scalar or vector? How is the energy possessed by a body measured?
What are the advantages and disadvantages of using solar cells for producing electricity?
An electric motor of power 100 W is used to drive the stirrer in a water bath. If 50% of the energy supplied to the motor is spent in stirring the water. Calculate the work done on the water in one minute.
