The number of workers and the time to complete a job is a case of direct proportion.
पर्याय
True
False
Advertisements
उत्तर
This statement is False.
Explanation:
The number of workers and the time to complete a job is a case of indirect proportion, e.g. If 60 workers can complete a work in 10 days.
Then, 120 workers can complete the same work in 5 days.
APPEARS IN
संबंधित प्रश्न
In a model of a ship, the mast is 9 cm high, while the mast of the actual ship is 12 m high. If the length of the ship is 28 m, how long is the model ship?
6 men can complete the electric fitting in a building in 7 days. How many days will it take if 21 men do the job?
Working 8 hours a day, Ashu can copy a book in 18 days. How many hours a day should he work so as to finish the work in 12 days?
A birthday party is arranged in third floor of a hotel. 120 people take 8 trips in a lift to go to the party hall. If 12 trips were made how many people would have attended the party?
If C = kd
(i) what is the relation between C and d?
(ii) find k when C = 30 and d = 6
(iii) find C, when d = 10
A truck requires 108 liters of diesel for covering a distance of 594 km. How much diesel will be required to cover a distance of 1650 km?
x and y are said to vary directly with each other if for some positive number k, ______ = k.
Write whether the following statement vary directly, vary inversely with each other, or neither of the two.
Area of land and its cost.
The cost of 27 kg of iron is Rs 1,080, what will be the cost of 120 kg of iron of the same quality?
A water tank casts a shadow 21 m long. A tree of height 9.5 m casts a shadow 8 m long at the same time. The lengths of the shadows are directly proportional to their heights. Find the height of the tank.