Advertisements
Advertisements
प्रश्न
The amount of extension in an elastic string varies directly as the weight hung on it. If a weight of 150 gm produces an extension of 2.9 cm, then what weight would produce an extension of 17.4 cm?
Advertisements
उत्तर
Let x gm be the weight that would produce an extension of 17.4 cm.
| Weight (in gm) | 150 | x |
| Length (in cm) | 2.9 | 17.4 |
\[ \text{ Since the amount of extension in an elastic string and the weight hung on it are in direct variation, we have } : \]
\[\frac{150}{x} = \frac{2 . 9}{17 . 4}\]
\[ \Rightarrow 17 . 4 \times 150 = 2 . 9 \times x\]
\[ \Rightarrow x = \frac{17 . 4 \times 150}{2 . 9}\]
\[ = \frac{2610}{2 . 9}\]
\[ = 900\]
\[\text{ Thus, the required weight will be 900 gm } .\]
APPEARS IN
संबंधित प्रश्न
Complite the following table given that x varies directly as y .
| x | 5 | ... | 10 | 35 | 25 | ... |
| y | 8 | 12 | ... | ... | ... | 32 |
In a library 136 copies of a certain book require a shelf-length of 3.4 metre. How many copies of the same book would occupy a shelf-length of 5.1 metres?
A worker is paid Rs 210 for 6 days work. If his total income of the month is Rs 875, for how many days did he work?
A woker is paid Rs 200 for 8 days work. If he works for 20 days, how much will he get?
Sita can finish typing a 100 page document in 9 hours. Mita in 6 hours and Rita in 12 hours. How long will they take to type a 100 page document if they work together?
A can do a piece of work in 40 days and B in 45 days. They work together for 10 days and then B goes away. In how many days will A finish the remaining work?
If C = kd
(i) what is the relation between C and d?
(ii) find k when C = 30 and d = 6
(iii) find C, when d = 10
If x and y are in direct proportion, then (x – 1) and (y – 1) are also in direct proportion.
The number of workers and the time to complete a job is a case of direct proportion.
The cost of 27 kg of iron is Rs 1,080, what will be the cost of 120 kg of iron of the same quality?
