Advertisements
Advertisements
प्रश्न
A worker is paid Rs 210 for 6 days work. If his total income of the month is Rs 875, for how many days did he work?
Advertisements
उत्तर
Let x be the number of days for which the worker is paid Rs 875.
| Income (in Rs.) | 210 | 875 |
| Number of days | 6 | x |
\[\text{ Since the income of the worker and the number of working days are in direct variation, we have: } \]
\[\frac{210}{875} = \frac{6}{x}\]
\[ \Rightarrow 210 \times x = 875 \times 6\]
\[ \Rightarrow x = \frac{875 \times 6}{210}\]
\[ = \frac{5250}{210}\]
\[ = 25\]
\[\text{ Thus, the required number of days is 25 } .\]
संबंधित प्रश्न
In 15 days, the earth picks up 1.2 × 108 kg of dust from the atmosphere. In how many days it will pick up 4.8 × 108 kg of dust?
A, B and C can reap a field in \[15\frac{3}{4}\] days; B, C and D in 14 days; C, D and A in 18 days; D, A and B in 21 days. In what time can A, B, C and D together reap it?
Working 8 hours a day, Ashu can copy a book in 18 days. How many hours a day should he work so as to finish the work in 12 days?
A cistern can be filled by one tap in 8 hours, and by another in 4 hours. How long will it take to fill the cistern if both taps are opened together?
Ten men take 4 days to complete the task of tarring a road. How many days would 8 men take?
If half a meter of cloth costs ₹ 15. Find the cost of `8 1/3` meters of the same cloth
The perimeter of a circle and its diameter vary ______ with each other.
In a camp, there is enough flour for 300 persons for 42 days. How long will the flour last if 20 more persons join the camp?
If 25 metres of cloth costs Rs 337.50, then what will be the cost of 40 metres of the same type of cloth?
The cost of 27 kg of iron is Rs 1,080, what will be the cost of 120 kg of iron of the same quality?
