Advertisements
Advertisements
प्रश्न
In a certain bottling industry the quality control inspector recorded the weight of each of the 5 bottles selected at random during each hour of four hours in the morning.
| Time | Weight in ml | ||||
| 8:00 AM | 43 | 41 | 42 | 43 | 41 |
| 9:00 AM | 40 | 39 | 40 | 39 | 44 |
| 10:00 AM | 42 | 42 | 43 | 38 | 40 |
| 11:00 AM | 39 | 43 | 40 | 39 | 42 |
Advertisements
उत्तर
| Time | Weight in ml | `bar"X"` | R | ||||
| 8:00 AM | 43 | 41 | 42 | 43 | 41 | 42 | 2 |
| 9:00 AM | 40 | 39 | 40 | 39 | 44 | 40.4 | 5 |
| 10:00 AM | 42 | 42 | 43 | 38 | 40 | 41 | 5 |
| 11:00 AM | 39 | 43 | 40 | 39 | 42 | 40.6 | 4 |
| Total | 164 | 16 | |||||
The control limits for `bar"X"` chart is
`\overset{==}{"X"} = (sumbar"X")/"Number of samples" = 164/4` = 41
`bar"R" = 16/4` = 4
UCL = `\overset{==}{"X"} - "A"_2 bar"R"`
= 41 + (0.58)(4)
41 + 2.32 = 43.32
CL = `\overset{==}{"X"}` = 41
LCL = `\overset{==}{"X"} - "A"_2 bar"R"`
= 41 – (0.58)(4)
= 41 – 2.32
= 38.68
The control limits for range chart is
UCL = `"D"_4 bar"R"` = 2.115(4)
= 8.46
CL = `bar"R"` = 4
LCL = `"D"_2 bar"R"` = 0(4) = 0
Conclusion: Since all the points of sample mean and Range are within the control limits, the process is in control.
APPEARS IN
संबंधित प्रश्न
Define Statistical Quality Control
What do you mean by process control?
Name the control charts for variables
Write the control limits for the mean chart
Construct `bar"X"` and R charts for the following data:
| Sample Number | Observations | ||
| 1 | 32 | 36 | 42 |
| 2 | 28 | 32 | 40 |
| 3 | 39 | 52 | 28 |
| 4 | 50 | 42 | 31 |
| 5 | 42 | 45 | 34 |
| 6 | 50 | 29 | 21 |
| 7 | 44 | 52 | 35 |
| 8 | 22 | 35 | 44 |
(Given for n = 3, A2 = 1.023, D3 = 0 and D4 = 2.574)
Choose the correct alternative:
The quantities that can be numerically measured can be plotted on a
Choose the correct alternative:
How many causes of variation will affect the quality of a product?
Choose the correct alternative:
The assignable causes can occur due to
Choose the correct alternative:
`bar"X"` chart is a
Choose the correct alternative:
The LCL for R chart is given by
