Advertisements
Advertisements
प्रश्न
An electric motor drives a machine which lifts a mass of 4 kg through a height of 10 m in 5 s at a constant speed. Assuming g = 10 ms-2, calculate
(i) the amount of work done, (ii) the power of the machine.
Advertisements
उत्तर
Given mass m = 4 kg,height h = 10m, time t = 5s
(i) work done = mgh = 4 x 10 x 10 = 400 j
(ii) power = `"work done"/"time taken" = 400/5` = 80 w
APPEARS IN
संबंधित प्रश्न
State the S.I. unit of work and define it.
.A man raises a box of mass 50kg to a height of 2m in 20s, while another man raises the same box to the same height in 50s. Compare:
(i) the work done, and
(ii) the power developed by them.
Give one example each in which a force does (a) positive work (b) negative work, and (c) zero work.
In which of the following case the work done by a force will be maximum : when the angle between the direction of force and direction of motion is 0° or 90°?
Nm is the unit of .......
Complete the following sentences:
The SI unit of work is ....... and of power is .......
Who is the odd one out?
