.A man raises a box of mass 50kg to a height of 2m in 20s, while another man raises the same box to the same height in 50s. Compare:
(i) the work done, and
(ii) the power developed by them.
Advertisements
उत्तर
(i) Work done to raise the block of mass 50kg is same for both.
(ii) Power= Work done/time. As the time taken by the first man is less therefore power developed is more.
संबंधित प्रश्न
Derive a relationship between S.I. and C.C.S. unit of work
A coolie is moving on a road with a luggage on his head. Does he perform work against the force of gravity? Give reason for your answer.
Is work a scalar or a vector quantity?
Write the formula for work done on a body when the body moves at an angle to the direction of force. Give the meaning of each symbol used.
Explain by an example that a body may possess energy even when it is not in motion.
Complete the following sentences:
Joule is the unit of .......
A weight lifted a load of 200 kgf to a height of 2.5 m in 5 s. calculate: (i) the work done, and (ii) the power developed by him. Take g= 10 N kg-1.
Name the physical quantity whose MKS units are kgm2s-3.
If an electric bulb of 100 watt is lighted for 2 hours, how much electric energy would be consumed?
How much energy is gained by a box of mass 20 kg when a man, runs carrying the box with a speed of 3 m/s-1 to catch the bus?