Advertisements
Advertisements
प्रश्न
A man raises a box of mass 50 kg to a height of 2 m in 20 s, while another man raises the same box to the same height in 50 s. Compare:
- the work done, and
- the power developed by them. Take g = 10 N kg-1
Advertisements
उत्तर
Mass of box m = 50 kg
Height to which box is raised h = 2m
(i) Work done by each man = mgh
= 50 × 10 × 2
= 1000 J
∵ Work done is independent of time taken
∴ Ratio of work done = 1 : 1
(ii) `"Power in first case"/"Power in second case" = (w/t_1)/(w/t_2)`
= `(1000/(20 s))/(1000/(50 s))`
= `50/20`
= 5 : 2
APPEARS IN
संबंधित प्रश्न
A stone of mass m is rotated in a circular path with a uniform speed by tying a strong string with the help of your hand. Answer the following questions
1) Is the stone moving with a uniform or variable speed?
2) Is the stone moving with a uniform acceleration? In which direction does the acceleration act?
3) What kind of force acts on the hand and state its direction?
When a body is placed on a table top, it exerts a force equal to its weight downwards on the table top but does not move or fall

1) Name the force exerted by the table top
2) What is the direction of the force?
When does a force do work?
A coolie X Carrying a load on his head climbs up a slope and another coolie Y carrying the identical load on his head move the same distance on a frictionless horizontal platform. Who does more work? Explain the reason.
The work done by a fielder when he takes a catch in a cricket match, is negative. Explain.
Give an example when work done by the force of gravity acting on a body is zero even though the body gets displaced from its initial position.
Work is a scalar quantity because it is a measure of transfer of energy without indicating any direction
In the following case write yes, if the work is being done and no if no work is being done.
A man moving on the rough ground.
State the condition when the work done by the force is positive
State two conditions for work to be done.