प्रश्न
The break-even Point and the shutdown point are different. How?
Distinguish between break-even point and shut-down point.
अंतर स्पष्ट करें
Advertisements
उत्तर
| Sr. No. | Basis | Break-even Point | Shut-down Point |
| 1. | Definition | Level of output where Total Revenue (TR) = Total Cost (TC). | Level of output where Total Revenue (TR) = Total Variable Cost (TVC). |
| 2. | Profit/Loss | Firm earns zero economic profit (normal profit); no profit, no loss. | Firm makes a loss equal to Total Fixed Cost (TFC). |
| 3. | Cost Coverage | The firm covers both fixed and variable costs at the break-even point. | The firm covers only variable costs at the shutdown point. |
| 4. | Operational Decision | Firm continues to operate because all costs are covered. | Firm may stop production temporarily to avoid further losses. |
| 5. | Economic Meaning | The break-even point shows sustainability without profit. | The shutdown point shows the minimum level of operation to avoid bigger losses. |
shaalaa.com
क्या इस प्रश्न या उत्तर में कोई त्रुटि है?