State two disadvantages of producing hydroelectricity.
Advertisements
उत्तर
Disadvantages of producing hydroelectricity:
1. Due to the construction of dams over the rivers, plants and animals of that place get destroyed or killed.
2. The ecological balance in the downstream areas of rivers gets disturbed.
संबंधित प्रश्न
.A man raises a box of mass 50kg to a height of 2m in 20s, while another man raises the same box to the same height in 50s. Compare:
(i) the work done, and
(ii) the power developed by them.
A box of weight 150 kgf has gravitational potential energy stored in it equal to 14700 J. Find the height of the box above the ground. (Take g = 9.8 N kg-1)
State two advantage of producing hydroelectricity.
How much work is done when a body of mass m is raised to a height h above the ground?
A girl is carrying a school bag of 3 kg mass on her back and moves 200 m on a levelled road. If the value of g be 10 m/s2, the work done by the girl against the gravitational force will be :
A man carrying a suitcase in his hand is walking horizontally. What is the work done against gravity?
A force is applied on a body of mass 20 kg moving with a velocity of 40 ms−1. The body attains a velocity of 50 ms−1 in 2 seconds. Calculate the work done by the body.