Advertisements
Advertisements
प्रश्न
Shaheed can prepare one wooden chair in 3 days and Shaif can prepare the same chair in 4 days. If they work together, in how many days will they prepare:
(i) one chair?
(ii)14 chairs of the same kind?
Advertisements
उत्तर
Shaheed's 1 day's work = `1/3`
and Shaif's 1 day's work = `1/4`
Both one day's work `= 1/3 + 1/4 = (4 + 3)/12 = 7/12`
∴ Both can prepare the chair in =`12/7` days
`= 1 5/7` days
One chair is prepared in = `1 5/7` days
∴ 14 chairs will be prepared in = `12/7 xx 14 = 24` days.
APPEARS IN
संबंधित प्रश्न
A can do a piece of work in 6 days and B can do it in 8 days. How long will they take to complete it together?
A can do a piece of work in 4 days and B can do the same work in 5 days. Find, how much work can be done by them working together in:
- one day
- 2 days
What part of work will be left, after they have worked together for 2 days?
A train travels 700 metres in 35 seconds. What is its speed in km/h?
A racing car covered 600 km in 3 hours 20 minutes. Find its speed in metre per second. How much distance will the car cover in 50 sec?
A boy drives his scooter with a uniform speed of 45 km/h. Find the time taken by him to cover 108 km.
Wilson reached 240 Km at the speed of 60 Km/hour. How much time did he travelled?
Anbarasan travelled 350 Km at the speed of 70 Km/hour. Find the time taken for his travel
Fathima reached 480 Km at the speed of 120 Km/hour. How much time did she travelled?
What is the correct relationship between speed (S), distance (D), and time (T)?
A runner covers 900 m in 3 min. Speed in m s⁻¹ is:
