Advertisements
Advertisements
प्रश्न
A, B and C together finish a work in 4 days. If A alone can finish the same work in 8 days and B in 12 days, find how long will C take to finish the work.
Advertisements
उत्तर
A. B and C finish work together in = 4 days.
A. B and C finish work together in 1 day = `1/4`
A' one day work = `1/8`
B's one day work = `1/12`
∴ C's one day work `= 1/4 - (1/8 + 1/12)`
`= (6 - (3 + 2))/24 = 1/24`
∴ C can finish the work in = 24 days
APPEARS IN
संबंधित प्रश्न
A and B working together can do a piece of work in 10 days B alone can do the same work in 15 days. How long will A alone take to do the same work?
Two taps can fill a cistern in 10 hours and 8 hours respectively. A third tap can empty it in 15 hours. How long will it take to fill the empty cistern, if all of them are opened together?
A motorist travelled the distance between two towns, which is 65 km, in 2 hours and 10 minutes. Find his speed in metre per minute.
A train travels 700 metres in 35 seconds. What is its speed in km/h?
A racing car covered 600 km in 3 hours 20 minutes. Find its speed in metre per second. How much distance will the car cover in 50 sec?
Rohit goes 350 km in 5 hours. Find:
(i) his speed
(ii) the distance covered by Rohit in 6.2 hours
(iii) the time taken by him to cover 210 km.
Nazar travelled 360 Km at the speed of 90 Km/hour. Find the time taken for his travel
Name two things that are lying to your west.
Look at the different types of boats.
Some boats have motors and go further into the sea. since they go far out they can catch more fish. These boats travel faster, at a speed of about 20 km in one hour.
How far would the motorboats go in three and a half hours?
The SI unit of speed is:
