Advertisements
Advertisements
प्रश्न
The velocity of a car increases from 54 km/hr to 72 km/hr. How much is the work done if the mass of the car is 1500 kg?
Advertisements
उत्तर
Given:
Initial velocity of the car (u) = 54 km/hr
= `(54 xx 1000)/3600` m/s
= 15 m/s
Final velocity of the car (v) = 72 km/hr
= `(72 xx 1000)/3600` m/s
= 20 m/s
Mass of the car (m) = 1500 kg
Find: Work done (W)
Formula: Work done (W) = Final kinetic energy - Initial kinetic energy
Calculations:
W = `1/2"mv"^2 - 1/2"mu"^2`
W = `1/2"m"("v"^2 - "u"^2)`
W = `1/2 xx 1500(20^2 - 15^2)`
= `1/2 xx 1500(400 - 225)`
= `1/2 xx 1500 xx 175`
W = 131250 J
Work done to increase the speed of the car 131250 J.
APPEARS IN
संबंधित प्रश्न
State the S.I. unit of work and define it.
A body, when acted upon by a force of 10 kgf, moves to a distance 0.5 m in the direction of force. Find the work done by the force. Take 1 kgf = 10 N.
1 J = ______ calorie.
.A man raises a box of mass 50kg to a height of 2m in 20s, while another man raises the same box to the same height in 50s. Compare:
(i) the work done, and
(ii) the power developed by them.
Fill in the blank with suitable word :
1 joule is the work done when a force of 1 __________ moves an object through a distance of one __________ in the direction of __________.
What is the work done when the object acted upon by a force remains at rest?
What do you mean by a kilo joule?
A boy of mass m climbs up a staircase of vertical height h.
- What is the work done by the boy against the force of gravity?
- What would have been the work done if he uses a lift in climbing the same vertical height?
An object is dropped from a height H. when is its
(i) P.E. maximum,
(ii) K.E. maximum,
(iii) P.E. = K.E.?
A cricket ball is thrown up from the earth's surface. What happens to its P.E.
(a) during the motion
(b) at the highest point?
Give an example
Chemical energy changes to heat energy.
Is power a scalar or a vector quantity?
Why is less effort needed to lift a load over an inclined plane as compared to lifting the load directly?
(i) A 200g ball is thrown vertically upward with an initial velocity of 30 ms-1. Draw a velocity-time graph for the motion of ball.
(ii) How long will the ball take to reach the highest point?
(iii) What will be the kinetic energy of ball, when it returns to the starting point, neglecting the air resistance?
(iv) What will be the potential energy of ball at highest point?
A coolie is pushing a box weighing 1500 N up an inclined plane 7.5 m long on to a platform, 2.5 m above the ground.
(i) Calculate the mechanical advantage of the inclined plane. (ii) Calculate the effort applied by the coolie.
(iii) In actual practice, the coolie needs to apply more effort than what is calculated. Give one reason why you think the coolie needs to apply more effort.
Look at the activity below. Reason out whether or not work is done in the light of your understanding of the term ‘work’.
A wind-mill is lifting water from a well.
Look at the activity below. Reason out whether or not work is done in the light of your understanding of the term ‘work’.
A green plant is carrying out photosynthesis.
