प्रश्न
A swimming pool can be filled in 4 hours by 8 pumps of the same type. How many such pumps are required if the pool is to be filled in `2 2/3` hours?
Advertisements
उत्तर
A swimming pool can be filled in 4 hours by 8 pumps.
If we want to fill the swimming pool in 1 h, we required 4 × 8 = 32 pumps
In `2 2/3` i.e. `8/3 h`, the number of pumps required = `32 ÷ 8/3`
= `(32 xx 3)/8`
= 4 × 3
= 12 pumps
APPEARS IN
संबंधित प्रश्न
68 boxes of a certain commodity require a shelf-length of 13.6 m. How many boxes of the same commodity would occupy a shelf length of 20.4 m?
Aasheesh can paint his doll in 20 minutes and his sister Chinki can do so in 25 minutes. They paint the doll together for five minutes. At this juncture they have a quarrel and Chinki withdraws from painting. In how many minutes will Aasheesh finish the painting of the remaining doll?
6 men can complete the electric fitting in a building in 7 days. How many days will it take if 21 men do the job?
The cost of 12 quintals of soyabean is 36,000 rupees. How much will 8 quintals cost?
Expenditure of a family to number of members of the family are in direct proportion
A dozen bananas costs ₹ 20. What is the price of 48 bananas?
The shadow of a pole with height of 8 m is 6 m. If the shadow of another pole measured at the same time is 30 m, find the height of the pole?
Every 3 months Tamilselvan deposits ₹ 5000 as savings in his bank account. In how many years he can save ₹ 1,50,000
If two quantities x and y vary directly with each other, then ______ of their corresponding values remains constant.
l varies directly as m and l is equal to 5, when `m = 2/3`. Find l when `m = 16/3`.