Advertisements
Advertisements
प्रश्न
A manufacturer produces nuts ad bolts. It takes 1 hour of work on machine A and 3 hours on machine B to produce a package of nuts. It takes 3 hours on machine A and 1 hour on machine B to produce a package of bolts. He earns a profit, of Rs 17.50 per package on nuts and Rs. 7.00 per package on bolts. How many packages of each should be produced each day so as to maximize his profit, if he operates his machines for at the most 12 hours a day?
Advertisements
उत्तर
Let the manufacturer produce x packages of nuts and y packages of bolts. Therefore,
x ≥ 0 and y ≥ 0
The given information can be compiled in a table as follows.
| Nuts | Bolts | Availability | |
| Machine A (h) | 1 | 3 | 12 |
| Machine B (h) | 3 | 1 | 12 |
The profit on a package of nuts is Rs 17.50 and on a package of bolts is Rs 7. Therefore, the constraints are
`x+3y <= 12`
`3x+y<=12`
Total profit, Z = 17.5x + 7y
The mathematical formulation of the given problem is
Maximise Z = 17.5x + 7y … (1)
subject to the constraints,
x + 3y ≤ 12 … (2)
3x + y ≤ 12 … (3)
x, y ≥ 0 … (4)
The feasible region determined by the system of constraints is as follows.

The corner points are A (4, 0), B (3, 3), and C (0, 4).
The values of Z at these corner points are as follows.
| Corner point | Z = 17.5x + 7y | |
| O(0, 0) | 0 | |
| A(4, 0) | 70 | |
| B(3, 3) | 73.5 | → Maximum |
| C(0, 4) | 28 |
The maximum value of Z is Rs 73.50 at (3, 3).
Thus, 3 packages of nuts and 3 packages of bolts should be produced each day to get the maximum profit of Rs 73.50.
