Advertisements
Advertisements
प्रश्न
Advertisements
उत्तर
Given, mass m = 25g = `25/1000 "kg" = 1/40 "kg"`
initial velocity u = 600 m/s
final velocity v = 0 m/s
Distance traveled, s = 50 cm = 0.5m
Now, K.E of the bullet = `1/2` mu2 = `1/2 (1/40) (600)`2
or, K.E = 4500 J
let F be the resistive force
According to work energy theorem,
work done = change in K.E
or, work done = `1/2` m(v-u)2 = `1/2 (1/40)` (0 - 600)2 = -4500 J
Also, we know that: work done = force x displacement
`therefore` -4500 = F x 0.5
or, F = `-4500/0.5` = -9000 N
Hence, the resistive force is 9000 N.
APPEARS IN
संबंधित प्रश्न
Why is a jack screw provided with a long arm?
The S.I. unit of energy is .............
A boy of mass 40 kg climbs up the stairs and reaches the roof at a height 8 m in 5 s. Calculate:
- the force of gravity acting on the boy,
- the work done by him against the force of gravity,
- the power spent by boy. (Take g = 10 m s-2)
A bullet of mass 0.5 kg slows down from a speed of 5 m s-1 to that of 3 m s-1. Calculate the change in kinetic energy of the ball.
What is the work done when the object acted upon by a force remains at rest?
A man lifts a mass of 10 kg from the floor to a shelf 4 meter high. If g = 10 ms-2, what is the work done?
How is horse power related to the S. I. unit of power?
A canon ball of mass 500g is fired with a speed of 15m/s-1. Find: its momentum.
A block of mass 30 kg is pulled up a slope, as shown in diagram with a constant speed, by applying a force of 200 N parallel to slope.
A and B are initial and final positions of block.

(i) Calculate the work done by force in moving the block from A to B.
(ii) Calculate P.E. gained by block. [g=10ms-2]
Look at the activity below. Reason out whether or not work is done in the light of your understanding of the term ‘work’.
A green plant is carrying out photosynthesis.
