हिंदी

A production in charge was given a sample of toy train. He was asked to produce similar other toy trains. Which control process would he have followed? - Commerce

Advertisements
Advertisements

प्रश्न

A production in charge was given a sample of toy train. He was asked to produce similar other toy trains. Which control process would he have followed?

दीर्घउत्तर
Advertisements

उत्तर

  1. Setting Performance Standards: The sample toy train serves as the standard or benchmark. It defines the expected size, shape, color, design, and quality for the new toy trains.
  2. Measuring Actual Performance: The production in charge supervises the toy trains being manufactured. He checks whether the produced items match the features of the original sample.
  3. Comparing with Standards: Each toy train produced is compared with the sample to check for any deviations in quality, appearance, or functionality.
  4. Analyzing Deviations: If the produced toys differ from the sample (e.g., wrong color or defective wheels), these differences are identified and investigated to find the cause.
  5. Taking Corrective Action: The production team takes steps to fix the problem—such as adjusting machinery or training workers—to ensure future units match the sample accurately.
shaalaa.com
  क्या इस प्रश्न या उत्तर में कोई त्रुटि है?
अध्याय 12: Controlling - EXERCISES [पृष्ठ ३७१]

APPEARS IN

सी. बी. गुप्ता Commerce Volume 2 [English] Class 12 ISC
अध्याय 12 Controlling
EXERCISES | Q 19. | पृष्ठ ३७१
Share
Notifications

Englishहिंदीमराठी


      Forgot password?
Use app×