Advertisements
Advertisements
प्रश्न
Advertisements
उत्तर
K.E = `1/2` mv²
60 = `1/2` (30) (v)²
or v² = 4 m/s
or v= 2 m/s
APPEARS IN
संबंधित प्रश्न
Why is a jack screw provided with a long arm?
Derive a relationship between S.I. and C.C.S. unit of work
A girl weighing 400 N climbs a vertical ladder. If the value of g be 10 m s−2, the work by her after climbing 2 m will be :
Ravi applied a force of 10 N and moved a book 30 cm in the direction of the force. How much was the work done by Ravi?
A canon ball of mass 500g is fired with a speed of 15m/s-1. Find: its momentum.
State the amount of work done by an object when it moves in a circular path for one complete rotation. Give a reason to justify your answer.
Look at the activity below. Reason out whether or not work is done in the light of your understanding of the term ‘work’.
An engine is pulling a train.
A proton is kept at rest. A positively charged particle is released from rest at a distance d in its field. Consider two experiments; one in which the charged particle is also a proton and in another, a positron. In the same time t, the work done on the two moving charged particles is ______.
