प्रश्न

11 men can dig \[6\frac{3}{4}\] metre long trench in one day. How many men should be employed for digging 27 metre long trench of the same type in one day?

 
 
टिप्पणी लिखिए
Advertisements

उत्तर

Let x be the number of men required to dig a trench of 27 metre.

Number of men 11 x
Length (in m)
 

\[\frac{27}{4}\]
 

\[\frac{27}{4}\]
27

\[\text{ Since the length of the trench and the number of men are in direct variation, we have: }  \]
\[\frac{11}{x} = \frac{27/4}{27}\]
\[ \Rightarrow 11 \times 27 = x \times \frac{27}{4}\]
\[ \Rightarrow x = \frac{11 \times 27 \times 4}{27}\]
\[ = 44\]
\[\text{ Thus, 44 men will be required to dig a trench of 27 metre  } .\]