The Standard cost of a certain Chemical mixture is :
40% Material 'A' at Rs. 400 per tonne
60% Material 'B' at Rs. 600 per tonne
A standard loss of 10% is expected in production.
During a period there is used : 
90 tonnes Material 'A' at the cost of Rs. 360 per tonne.
110 tonnes Material 'B' at the cost of Rs. 680 per tonne.
The weight produced is 182 tonnes of good production .
Calculate :
(a) Material Cost Variance, (b) Material Price Variance,
(c) Material Usage Variance, (d) Material Mix Variance,
(e) Material Yield Variance.

Advertisements

उत्तर

Actual Production = 182 Tonnes
Standard Loss = 10 %
It means,
Expected Output (Units)      Input (Units)
                                 90 -→ 100
                                 182 -→ ?

`(182xx100)/90=202` Units

From the above informatlon, we can prepare table in the following manner:

Materials Standard Actual Standard Proportion of Actual Input Tonnes)
  Qty. (Tonnes) Rate (Rs.) Total (Rs.) Qty. (Rs.) Rate(Rs.) Total(Rs.)
A 81 400 32 400 90 360 32,400 80
B 121 600 72,600 110 680 74,800 120
  202   1,05,000 200   1,07,200 200

(a) Material Cost Variance (MCV) = (SR x SQ) - (AR x AQ)
Material A = ( 400 x 81) - (360 x 90)
= 32,400 - 32,400
= Nil

Material B = (600 x 121)-(680 x 110)
= 72,600 - 74,800
= Rs. 2,200 (A)

(b) Material Price Variance (MPV) = (SR-AR) x AQ
Material A = (400- 360) x 90 = Rs. 3,600 (F)
Material B = (600-680) x 110 = Rs. 8,800 (A)
= 5,200 (A)

(c) Material Usage Variance (MUV)= (SQ - AQ) x SR
Material A = (81 - 90) x 400 = Rs. 3,600 (A)
Material B = ( 121 - 110) x 600 = Rs. 6,600 (F)
= Rs. 3,000 (F)

(d) Material Mix Variance = SR x Difference in Mix
Material A = 400 x (80 - 90) = Rs. 4,000 (A)
Material B = 600 x (120 - 110) = Rs. 6,000 (F)
Rs. 2,000 (F)

(e) Material Yield Variance= (Actual Output - Standard Output) x Std. Cost

= (182-180) x 577.78 = Rs. 1,155.56 (F)