मराठी
महाराष्ट्र राज्य शिक्षण मंडळएस.एस.सी (इंग्रजी माध्यम) इयत्ता ६ वी

Take a pulley. Fix it at a height. Draw a string over the pulley. Tie a load of two kilograms at one end. Hold the other end of the string and pull it downwards to lift the load, first up to a

Advertisements
Advertisements

प्रश्न

Take a pulley. Fix it at a height. Draw a string over the pulley. Tie a load of two kilograms at one end. Hold the other end of the string and pull it downwards to lift the load, first up to a height of one metre and then up to a height of four metres. When is more work done?

दीर्घउत्तर
Advertisements

उत्तर

More work is done when the 2 kg load is lifted up to a height of 4 metres.

This is because the same load is lifted through a greater distance. Since work depends on both the force applied and the distance through which the object moves, lifting the load to 4 metres requires more work than lifting it to 1 metre.

shaalaa.com
  या प्रश्नात किंवा उत्तरात काही त्रुटी आहे का?
पाठ 11: Work and Energy - Intext Questions [पृष्ठ ८६]

APPEARS IN

बालभारती General Science Integrated [English] Standard 6 Maharashtra State Board
पाठ 11 Work and Energy
Intext Questions | Q 1. | पृष्ठ ८६
Share
Notifications

Englishहिंदीमराठी


      Forgot password?
Use app×