Advertisements
Advertisements
प्रश्न
If V is the volume of a cuboid of dimensions a, b, c and S is its surface area, then prove that
`1/V=2/S(1/a+1/b+1)`
Advertisements
उत्तर
Given that
Length = a
Breadth = b
Height = c
Volume `(v)=lxxbxxh`
`=axxbxxc=abc`
Surface area `2(lb+bh+hl)`
`=2(ab+bc+ac)`
`Now , 2/5[1/a+1/b+1/c]=2/(2(ab+bc+ca)) [[ab+bc+ca]]/(abc)`
`1/(abc)=1/v`
APPEARS IN
संबंधित प्रश्न
Find the cost of digging a cuboidal pit 8 m long, 6 m broad and 3 m deep at the rate of Rs 30 per m3.
The breadth of a room is twice its height, one half of its length and the volume of the room is 512cu. m. Find its dimensions.
Three metal cubes with edges 6 cm, 8 cm and 10 cm respectively are melted together and formed into a single cube. Find the volume, surface area and diagonal of the new cube.
How many cubic centimeters of iron are there in an open box whose external dimensions are 36 cm, 25 cm and I 6.5 cm, the iron being 1.5 cm thick throughout? If I cubic cm of iron weighs 15g, find the weight of the empty box in kg.
A cube of 9 cm edge is immersed completely in a rectangular vessel containing water. Ifthe dimensions of the base are 15 cm and 12 cm, find the rise in water level in the vessel.
A village having a population of 4000 requires 150 litres of water per head per day. It has a tank measuring 20 m × 15 m × 6 m. For how many days will the water of this tank last?
A wall of length 10 m was to be built across an open ground. The height of the wall is 4 m and thickness of the wall is 24 cm. If this wall is to be built up with bricks whose dimensions are 24 cm × 12 cm × 8 cm, How many bricks would be required?
The length of the longest pole that can be put in a room of dimensions (10 m × 10 m × 5 m) is ______.
The surface area of the three coterminus faces of a cuboid are 6, 15 and 10 cm2 respectively. The volume of the cuboid is ______.
A truck carrying 7.8 m3 concrete arrives at a job site. A platform of width 5 m and height 2 m is being contructed at the site. Find the length of the platform, constructed from the amount of concrete on the truck?
