Advertisements
Advertisements
प्रश्न
A load of 100 kg is pulled up by 5 m. Calculate the work done. (g = 9.8 m/s2)
Advertisements
उत्तर
Mass of the body (m) = 100 kg
Height by which the body is lifted (h) = 5 m
Work done in lifting a body = (Weight of body) (Vertical distance)
So, W = (m) (g) (h)
Therefore,
(W) = (100) (9.8) (5) J .
= 4900 J
So , the work done is 4900 J .
APPEARS IN
संबंधित प्रश्न
A lamp consumes 1000 J of electrical energy in 10 s. What is its power?
Define average power.
A battery lights a bulb. Describe the energy changes involved in the process.
An electric heater is rated 1500 W. How much energy does it use in 10 hours?
Define kilowatt-hour.
An electric heater uses 600 kJ of electrical energy in 5 minutes. Calculate its power rating.
In loading a truck, a man lifts boxes of 100 N each through a height of 1.5 m.
If the man lifts 4 boxes per minute, at what power is he working?
(g = 10 m s−2)
Which one of the following statements about power stations is not true?
An electric motor raises a load of 0.2 kg, at a constant speed, through a vertical distance of 3.0 m in 2 s. If the acceleration of free fall is 10 m/s2, the power in W developed by the motor in raising the load is :
How is the power related to the speed at which a body can be lifted? How many kilograms will a man working at the power of 100 W, be able to lift at a constant speed of 1 m s–1 vertically? (g = 10 m s–2)
