BE Civil Engineering Semester 8 (BE Fourth Year)University of Mumbai
Share
Notifications

View all notifications

Advanced Repairs and Rehabilitation of Structure Semester 8 (BE Fourth Year) BE Civil Engineering University of Mumbai Topics and Syllabus

Login
Create free account


      Forgot password?
CBCGS [2019 - current]
CBGS [2015 - 2018]
Old [2000 - 2014]

Topics with syllabus and resources

100.00 Introduction
  • Need for strengthening due to various reasons such as ageing,
  • natural calamities, increase of load,
  • change of function and design, construction errors
200.00 Structural Strengthening
  • Strengthening and retrofitting of columns, beams, walls, footings and slabs, piers of concrete structures by jacketing, external posttensioning, replacing or adding reinforcement, plate bonding, textile reinforced concrete.
300.00 Specialized Repairs

Electrochemical repair using re-alkalization and chloride extraction techniques, Specialized repairs for chemical disruption, fire, marine exposure etc, Repair of damaged structures of water retaining structures, hydraulic structures, Pavements and Runways, Tunne Bridges, Piers and Flyovers, Parking Garages, Underwater repair, Masonary Repair, Repair and Restoration of Heritage Structures

400.00 Retrofitting by Composite Materials
  • Fiber reinforced concrete, Ultra-high performance fibre reinforced concrete (UHPFRC), Fiber reinforced composites, Carbon fibre reinforced polymer (CFRP), Fibre wrapping (Carbon, Aramide, Glass)
500.00 Seismic Retrofitting
  • Seismic strengthening of existing RC structures,
  • Use of FRP for retrofitting of damaged structures.
600.00 Special Care in Repair and Rehabilitation of Heritage Structures
S
View in app×