For the following problem, find the sequence that minimizes total elapsed time (in hours) required to complete jobs on two machines M1 and M2 in the order M1-M2 Also find the minimum elapsed time T. - HSC Commerce 12th Board Exam - Mathematics and Statistics

Login
Create free account


      Forgot password?

Question

For the following problem, find the sequence that minimizes total elapsed time (in hours) required to complete jobs on two machines M1 and M2 in the order M1-M2 Also find the minimum elapsed time T.

Jobs

A

B

C

D

E

Machine M1

5

1

9

3

10

Machine M2

2

6

7

8

4

Solution

 

Given :

Jobs

A

B

C

D

E

Machine M1

5

1

9

3

10

Machine M2

2

6

7

8

4

finding the optimal sequence :

The minimum processing time on two machines is 1 which correspond to task B on machine M1. This shows that task B will be preceding first. After assigning task B, we are left with 4 tasks on two machines

 

Jobs

A

C

D

E

Machine M1

5

9

3

10

Machine M2

2

7

8

4

 

B        

Minimum processing time in this reduced problem is 2 which correspond to job A on machine M2 therefore task A will be processed in the last.

B       A

The problem now reduces to following 3 tasks on two machines with processing time as follows:

Jobs

C

D

E

Machine M1

9

3

10

Machine M2

7

8

4

Minimum processing time in this reduced problem is 3 which correspond to job D on machine M1 therefore task D will be processed in the next to B.

B D     A

The problem now reduces to following 2 tasks on two machines with processing time as follows:

Jobs

C

E

Machine M1

9

10

Machine M2

7

4

Minimum processing time in this reduced problem is 4 which correspond to job E on machine Mtherefore task E will be processed in the next to last.

B D C E A

Further, it is also possible to calculate the minimum elapsed time corresponding to the optimal sequencing B→D→C→E→A

Job Sequence

Machine M1

Machine M2

 

Time In

Time Out

Time In

Time Out

B

0

1

1

7

D

1

4

7

15

C 4 13 15 22
E 13 23 23 27
A 23 28 28 30

 

Hence the total elapsed time for this proposed sequence  staring from job B to completion of job A is 30 hours .During this time machine M1 remains idle for 2 hours and the machine M2 remains idle for 3 hours

Minimum time elapse : 30 Hours

 

  Is there an error in this question or solution?

APPEARS IN

 2014-2015 (March) (with solutions)
Question 5.1.1 | 3.00 marks
Solution For the following problem, find the sequence that minimizes total elapsed time (in hours) required to complete jobs on two machines M1 and M2 in the order M1-M2 Also find the minimum elapsed time T. Concept: Sequencing in Management Mathematics.